Configure up to 4 circuits — shed, greenhouse, trailer, or drone & EV charging — load each one with your real equipment, and get a side-by-side cost comparison over 10 years.
3,000W
Max A/C Output
98%
Solar Efficiency
11 kW
Max Solar Input
4
Priority Outlets
<$0.09
Cost / kWh
Solar Location & Panel Setup
4.5
4.0 kW
VS3000™ accepts up to 11 kW DC input. Up to 98% solar-direct efficiency — no battery required. ATS automatically switches each outlet between solar and backup when clouds roll in.
VS3000™ Investment
Operation Type — Select Your Site
🏚
Shed / Shop
🌱
Greenhouse
🚚
Trailer / Mobile
🚁
Drones & EVs
Operation Hours
250 days
8.0 hrs
4-Circuit Load Configuration — Priority 1 = Always On
VS3000™ outlet priority: When solar drops, Outlet 4 (lowest priority) sheds first. Outlet 1 (highest) stays powered longest. Total continuous capacity: 3,000W / 4,500W surge. Max solar input: 11 kW.
Gas Generator Configuration
0.75 gph
$3.50
Annual Maintenance Costs
Include Generator Replacement at Year 7
Avg gas generator lifespan: 6–8 years at moderate commercial use
☀ VS3000™ Solar — Year 1 Cost
—
hardware + operating
VS
⛽ Gas Generator — Year 1 Cost
—
hardware + fuel + maintenance
10-Year Cumulative Cost — Solar vs Gas
VS3000™ Solar cumulative costGas Generator cumulative cost